The cement block forming machine, also known as the cement block machine, can generally use fly ash, stone powder, gravel, cement, construction waste, etc. as raw materials. After scientific proportioning, water is added and mixed, and cement blocks and hollow blocks are produced through hydraulic molding. At the same time, it can also produce cement standard bricks, curbstones and colored pavement bricks.


The maintenance of the machine is an extremely important and regular work. It should be closely coordinated with the operation and maintenance of the machine, and full-time personnel should be on duty for inspection.


Maintenance of the machine

1. Bearing

The shaft of the crusher bears the entire load of the machine, so good lubrication has a great relationship with the life of the bearing. It directly affects the service life and operation rate of the machine. Therefore, the injected lubricating oil must be clean and the seal must be good. The main oiling points of this machine are (1) rotating bearings (2) roller bearings (3) all gears (4) movable bearings and sliding surfaces.

2. Newly installed wheel hoops are prone to loosening and must be checked frequently.

3. Pay attention to whether all parts of the machine are working normally.

4. Pay attention to check the wear degree of easily worn parts and replace the worn parts at any time.

5. The plane of the chassis where the movable device is placed should be free of dust and other objects to prevent the movable bearing from being unable to move on the chassis when the machine encounters materials that cannot be broken, resulting in serious accidents.

6. If the bearing oil temperature rises, the machine should be stopped immediately to check the cause and eliminate it.

7. If there is an impact sound when the rotating gear is running, the machine should be stopped immediately for inspection and elimination.

Installation and test run

1. The equipment should be installed on a horizontal concrete foundation and fixed with anchor bolts.

2. During installation, pay attention to the verticality of the main body and the horizontal.

3. After installation, check whether the bolts of each part are loose and whether the main compartment door is tight. If so, please tighten it.

4. Configure the power cord and control switch according to the power of the equipment.

5. After the inspection, conduct a no-load test run. If the test run is normal, production can be carried out.